CT and VT Selection for MV Switchgear: A Specification Guide for Protection and Metering
Selecting medium-voltage switchgear involves more than determining rated voltage, continuous current and short-circuit capacity. Current transformers (CTs) and voltage transformers (VTs) are equally important because they provide the electrical measurements required for protection, metering and control. Incorrect CT VT selection can result in inaccurate metering, protection relay maloperation, CT saturation or costly modifications during commissioning. Two switchgear panels w
Derrel Gerary
Sep 307 min read


Arc Flash Mitigation in MV Switchgear: How to Improve Personnel Safety and Reduce Incident Energy
An arc flash in medium-voltage (MV) switchgear can release intense heat, pressure and molten material within a fraction of a second. Consequences include injury, equipment damage and extended outages. Effective arc flash mitigation switchgear design requires more than choosing an internal-arc-rated enclosure. Engineers must consider fault current, clearing time, configuration and worker exposure. For EPC contractors, protective systems and operating arrangements should be spe
Derrel Gerary
Sep 245 min read


MV Cable Termination for Switchgear: Key Design and Specification Considerations
Medium-voltage switchgear specifications often focus on rated voltage, continuous current, short-circuit capacity and protection systems. However, one critical interface can create significant installation problems when overlooked: MV cable termination. The connection between incoming or outgoing medium-voltage cables and switchgear must accommodate the cable dimensions, termination accessories, electrical clearances, earthing arrangement and physical installation requirement
Derrel Gerary
Sep 178 min read


Transformer Impedance and Fault Level: Why It Matters When Specifying Power Transformers
Transformer selection involves much more than choosing the correct MVA rating and voltage ratio. One of the most important technical parameters is transformer impedance, which directly influences short-circuit current, voltage regulation, protection coordination and equipment compatibility. For utilities, industrial facilities, mining operations and renewable energy projects, an incorrect impedance selection can create significant engineering and operational problems. A trans
Derrel Gerary
Sep 107 min read


Protection Coordination for MV Switchgear and Transformers: A Practical Guide for Industrial and Utility Projects
A short circuit should not automatically disconnect an entire electrical network. If a fault occurs on one downstream feeder, the protection system should identify the abnormal condition and isolate the smallest practical section of the network while keeping healthy equipment energised. This is the objective of protection coordination. In medium-voltage industrial plants, utility substations, mining facilities and renewable energy projects, coordination involves much more tha
Derrel Gerary
Sep 38 min read


IEC 61850 for Substation Automation: What EPC Contractors and Engineers Need to Specify
Modern substations increasingly depend on communication networks as much as conventional electrical wiring. Protection relays, switchgear, bay controllers, meters, SCADA gateways and other intelligent electronic devices must exchange information rapidly and reliably. For utility, renewable energy, mining and industrial projects, this makes the communication architecture an important part of the overall electrical design. IEC 61850 substation automation provides a standardised
Derrel Gerary
Aug 317 min read


E-House vs Conventional Substation: Which Is Better for Mining and Renewable Energy Projects?
Mining and renewable energy projects often require electrical infrastructure to be delivered under difficult conditions. Remote locations, limited construction resources, aggressive schedules, harsh environments and complex commissioning requirements can all influence how a substation should be designed and delivered. One of the key decisions is whether to construct a conventional substation on site or use an E-House substation that is largely assembled and tested before deli
Derrel Gerary
Aug 279 min read


Transformer Condition Monitoring: How DGA and Online Monitoring Help Prevent Failures
Power transformers are among the most critical and expensive assets in electrical networks. A transformer failure can result in unplanned outages, equipment damage, production losses and lengthy replacement periods. The challenge is that many transformer problems develop gradually before a major failure occurs. Insulation deterioration, overheating, moisture contamination, partial discharge and on-load tap changer wear can all produce warning signs long before the transformer
Derrel Gerary
Aug 208 min read


Generator Step-Up Transformers for Renewable Energy Projects: Selection and Specification Guide
Renewable energy projects depend on more than solar modules, wind turbines or power conversion systems. Before generated power can be exported to the electricity network, it must be transformed to the voltage required by the project’s grid connection. This is the role of the generator step-up transformer. A GSU transformer increases the voltage from the renewable generation or collector network to the transmission or distribution voltage at the point of connection. In utility
Derrel Gerary
Aug 136 min read


33kV Switchgear for Renewable Energy Projects: Specification Guide for Solar, Wind and BESS
Australia's transition toward utility-scale solar, wind generation and battery energy storage is increasing the importance of reliable medium-voltage collector systems. At many renewable energy sites, 33kV switchgear sits between individual generation or storage blocks and the main grid connection substation. It provides the switching, protection, isolation, metering and control required to collect power from multiple feeders before transferring it toward the grid connection
Derrel Gerary
Aug 68 min read


Electrical Equipment Procurement for Grid Projects: How to Reduce Switchgear and Transformer Supply Risk
Electrical equipment can become one of the most schedule-sensitive parts of a grid, renewable energy, utility, mining, or infrastructure project. A transformer may take months to engineer, manufacture, test, transport, install, and commission. MV and HV switchgear packages require detailed engineering interfaces involving protection, CTs, VTs, SCADA, cables, civil layouts, and operating philosophy. As a result, successful electrical equipment procurement requires much more th
Derrel Gerary
Jul 307 min read


How to Specify High Voltage GIS for Renewable Energy and Utility Substations
High voltage substations are becoming increasingly important as renewable generation, battery storage, transmission upgrades and large industrial connections reshape electrical networks across Australia. At the centre of many compact high-voltage substations is Gas-Insulated Switchgear (GIS). GIS provides switching, isolation, protection interfaces and busbar functions within grounded metal enclosures using an insulating gas or gas mixture. Compared with conventional air-insu
Derrel Gerary
Jul 237 min read


Transformer Losses and Efficiency: How to Reduce Lifecycle Costs in Industrial and Utility Projects
Transformers are among the most efficient assets in an electrical system, but even small losses matter when equipment operates continuously for years. For industrial plants, utilities, mining operations, renewable energy projects and large commercial facilities, transformer selection should therefore consider more than purchase price. The key question is not simply, “What does the transformer cost to buy?” It is, “What will this transformer cost to own and operate over its se
Derrel Gerary
Jul 168 min read


Internal Arc Classification (IAC) in MV Switchgear: What Engineers and EPC Contractors Need to Know
Internal arc performance is one of the most important safety considerations when specifying medium voltage switchgear. A switchboard may have the correct voltage rating, continuous current, short-circuit withstand rating and circuit breaker capacity, but those electrical ratings alone do not explain what happens around the enclosure if an internal arc fault occurs. This is where Internal Arc Classification (IAC) becomes important. For electrical engineers, EPC contractors, ut
Derrel Gerary
Jul 911 min read


MV Switchgear for Battery Energy Storage Systems: Key Design Considerations for BESS Projects in Australia
Battery Energy Storage Systems are becoming an increasingly important part of Australia’s electrical infrastructure. Utility-scale batteries, renewable energy projects, mining microgrids, industrial facilities, and network-support projects all rely on BESS to store energy, manage power flows, and support more flexible electrical operation. Behind every large BESS is a medium voltage electrical system that must connect battery inverters, transformers, auxiliary systems, and th
Derrel Gerary
Jul 210 min read


Western Australia’s SWIS Growth: What It Means for Switchgear, Transformers, and Substation Planning
Western Australia’s South West Interconnected System is entering a major growth phase. The SWIS supplies WA’s main electricity market and supports a large part of the state’s population, commercial activity, industrial load, mining-related infrastructure, and renewable energy development. For utilities, mining operators, industrial facilities, infrastructure developers, renewable energy proponents, EPC contractors, and consultants, this growth has a clear implication: substat
Derrel Gerary
Jun 308 min read


What AEMO’s 2026 Integrated System Plan Means for Grid Equipment Procurement
AEMO’s 2026 Integrated System Plan, released on 25 June 2026, is more than a long-term energy market document. For EPC contractors, utilities, renewable developers, mining operators, infrastructure planners and procurement teams, it is a clear signal that Australia’s grid equipment procurement strategy must become more proactive, technically disciplined and supply-chain aware. The 2026 Integrated System Plan confirms that Australia’s least-cost pathway for the National Electr
Derrel Gerary
Jun 259 min read


Why Power Quality Matters More as Australian Facilities Electrify
Australian facilities are electrifying fast. Commercial buildings, industrial plants, mining operations, data centres, transport infrastructure, water treatment facilities, and utilities are adopting more electrically driven systems to improve efficiency, automation, sustainability, and operational control. This shift is positive, but it also changes the behaviour of the electrical network inside the facility. Variable speed drives, UPS systems, solar inverters, battery inver
Derrel Gerary
Jun 187 min read


Dry Type vs Oil Type Distribution Transformers: Which Is Better for Commercial and Utility Applications?
Choosing between a dry type transformer and an oil type transformer is one of the most important decisions in a commercial or utility power distribution project. Both transformer types can deliver reliable performance, but they are designed for different installation environments, safety priorities, cooling methods, maintenance expectations, and lifecycle cost profiles. For project owners, consulting engineers, EPC contractors, utilities, facility managers, and procurement te
Derrel Gerary
Jun 118 min read


How to Prepare MV Switchgear Specifications for Renewable Energy Projects in Australia
Renewable energy projects in Australia are becoming more technically demanding. Solar farms, wind farms, battery energy storage systems, hybrid power plants, mining microgrids, and utility-scale substations all depend on reliable medium voltage infrastructure to collect, protect, and distribute power safely. As the Australian power system moves toward higher renewable penetration, project developers and EPC teams need more than a basic equipment quotation. They need a clear,
Derrel Gerary
Jun 48 min read